Sewing operator stitching garments on an industrial machine in a garment factory

Garment Costing: Cost Per Minute and CM Price Explained

Published: 25 November 2026 · By Riya Agarwal

To calculate garment cost per minute (CPM), divide the factory costs you want to recover for a period by the number of standard minutes the operators are expected to produce in that period. Multiply that efficiency-adjusted CPM by the garment’s standard allowed minutes (SAM) to get its cost of making (CM). To turn that cost into a selling price, check which expenses and profit the factory still needs to add.

What do SAM and SMV mean on a garment cost sheet?

SAM means standard allowed minutes. You may also see SMV, or standard minute value. Both describe the time assigned to specified work on a garment using an agreed method. A shirt costing is easier to understand if you can see the work behind the number. Making a patch pocket, pressing its edges and attaching it are identifiable jobs you can discuss with the factory.

Ask which operations the minutes cover. A supplier might give you a sewing SAM and recover the costs of cutting and finishing through the minute rate. Another might give you separate figures for those departments. If you change the pocket after sampling, ask the supplier to mark the affected operations. You can then see why the original minutes need updating even though the body of the shirt looks much the same.

The standard time belongs to the method being costed. Ask whether it comes from a time study, an established operation breakdown or an estimate pending a sample. A sample-room observation can help a discussion, but the time from handing over fabric to collecting a finished sample also includes waiting. Using that whole interval as sewing time would charge the wrong activity to the shirt.

What is the cost per minute formula in a garment factory?

Efficiency-adjusted CPM = total factory cost allocated to making in the period ÷ (operators × available minutes per operator in the period × expected efficiency). Use efficiency as a decimal. If your numerator is monthly, the minutes must cover the same month. If the cost covers one line, count the operators on that line.

Build the top of the fraction first. Name the costs the rate will recover. A loaded rate might include operator pay, employer costs, support staff and a share of rent or power. A labour-only rate leaves other expenses for separate lines. Keep garment fabric and separately charged printing outside this pool. Otherwise, adding them later to the garment sheet would charge the buyer twice.

Now check the bottom. Available minutes are the working minutes you have allowed for the period. Earned standard minutes are the standard minutes represented by the work completed. For planning, multiply available minutes by expected efficiency to estimate earned minutes. If people work different schedules, add their available minutes individually before applying the efficiency assumption.

For an order you have made before, compare the assumption with the recorded output for a similar run. For a new style, ask what the estimate assumes about batch size and changes between versions. Document how breaks and lost time were treated. The same lost minutes can creep into both the working schedule and the efficiency adjustment if nobody checks how the two figures were built.

How do I calculate CM per piece from SAM?

CM per piece = garment SAM × efficiency-adjusted CPM. That gives the making cost for the agreed scope. It is also the CM price if the minute rate already recovers everything the supplier intends to charge for making, including any agreed profit. If the rate is built from costs alone, ask where the factory adds its profit.

Some sheets start from a rate per available working minute. In that convention, CM is garment SAM multiplied by the working-minute rate, then divided by efficiency. Both methods give the same answer when they use the same inputs. Write “per available minute” or “per earned standard minute” next to the rate. That small label tells you whether the efficiency adjustment has already been made.

Example figures. Suppose one line has 20 sewing operators, each with 450 available minutes for the day. Its allocated making costs for the day total ₹13,500, including its share of cutting, finishing and factory overhead. The plan assumes 75% efficiency. Use a shirt with a sewing SAM of 18 minutes.

  1. Available working minutes are 20 × 450 = 9,000. Expected earned standard minutes are 9,000 × 0.75 = 6,750.
  2. The efficiency-adjusted rate is ₹13,500 ÷ 6,750 = ₹2 per standard minute. The making cost is 18 × ₹2 = ₹36 per shirt.
  3. Using the other convention, ₹13,500 ÷ 9,000 gives ₹1.50 per available minute. The same shirt takes an estimated 18 ÷ 0.75 = 24 working minutes. At ₹1.50 each, that is again ₹36.

There is a quick check on the result. In this example, 6,750 earned minutes divided by 18 gives 375 shirts if the line spends the day on this style. At ₹36 each, those shirts recover ₹13,500, exactly the amount we started with. Doing the calculation backwards can reveal a missed operator or an efficiency factor entered twice.

How does the CM figure turn into an FOB price?

FOB means Free On Board. Name the port of shipment on the quote. Under the ICC rule for sea or inland waterway transport, the seller clears the goods for export and delivers them on board the vessel. The seller covers costs up to that point. Main carriage and the buyer’s import costs sit beyond this price.

Below is the rest of the shirt cost sheet using example figures in rupees per piece. The minute rate above already includes the allocated factory overhead. Here we have kept the print, packing materials and seller’s shipment costs outside it so you can see where each enters the price.

Item per shirt Basis in this example Amount
Fabric 1.5 metres consumed, including the assumed cutting loss, at ₹80 per metre ₹120
Trims Buttons, thread and sewn labels ₹12
CM including factory overhead 18 standard minutes at ₹2 ₹36
Print Separately costed decoration. No garment wash specified. ₹8
Packing materials Per-shirt share ₹4
Delivery on board Allocated transport, export clearance and loading costs ₹9
Total cost before profit Sum of the costs above ₹189
FOB selling price ₹189 ÷ 0.90 for a 10% margin on the selling price ₹210

The supplier keeps ₹21 above the stated costs. That is 10% of ₹210. A 10% markup on cost would instead give ₹189 × 1.10 = ₹207.90. Write down the basis when somebody says “add ten per cent”. For a style with a separately charged garment wash, enter the wash alongside the print and recalculate the margin on the revised total.

How can buyers compare factory quotes fairly?

Give each supplier the same revision of the garment tech pack and the same quantities by size and colour. Ask each to name the quoted delivery point, currency and included processes. Before comparing the bottom lines, check whether the fabric consumption includes loss, who supplies the trims and whether the sample changes have reached the cost sheet. The guide to clothing costs covers the wider product budget.

If one making rate looks unusually low, ask which operation moves to another line on the quote. A separate finishing charge can explain the gap. If the difference is in the time, ask for a price for the simpler construction alongside the original. You can decide what the pocket or extra stitching is worth to the customer without asking someone to make the original garment in minutes it does not allow.

Frequently asked questions

Can I use the same CPM for every style?

You can use a common rate for work sharing the same cost pool and efficiency basis. Review the assumption if a style moves to another line or the order is split into much shorter runs.

Is the cost per minute the operator’s wage?

A factory minute rate can include employer costs, indirect labour and overhead. Ask for the scope of the rate before using it to estimate any one part of the garment cost.

Where do I enter overhead if CM already includes it?

Mark the covered overhead as included against the CM line. Add only expenses still outside the rate and identify what each one pays for.

What if the factory gives me actual working minutes?

Multiply actual working minutes per piece by the matching rate per available working minute. Check that the time already reflects the line’s performance before applying any efficiency factor.

Does an FOB garment price include freight to my country?

The buyer arranges the main carriage under FOB. To estimate your landed cost, start with the named-port quote and add the costs you bear from that delivery point onward.

Send Curves & Hems your style details, order split and intended delivery point to ask for a sample or an itemised quote.

Sources: Fair Wear costing calculator guidance, Fair Wear labour minute costing, International Trade Centre garment costing guide, ICC Incoterms wallchart. Checked 25 November 2026.

Leave a Reply